
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-15
5.2.2.5 Follow-up operation
After left and right crawler carriers are attached on the crane, dismantle folding brackets so that
the horizontal anchoring rods can be connected, and central counterweight can be assembled.
See the figure 5-15.
Figure 5-15 Dismantling of folding brackets
a) Retract support cylinders, put support plates on the attachment points at the side of folding
brackets, disconnect hydraulic connection of folding brackets and tilt support cylinder. See
the figure 5-16.
Figure 5-16 Folding brackets to be dismantled
b) Dismantle folding brackets by use of mounting cylinder or other device, and then connect
the horizontal anchoring rods.
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...