
Operator’s Manual for Crawler Crane
Assembly
and
Dismantli
ng
5-42
5.4.1.2 Combination of main boom anchoring rods
Now, we will illustrate the connecting methods for 219'10" (67m) main boom anchoring rods.
Please see the figure 5-42.
1
2
3
4
8
9
5
6
7
(7)
(7)
22
'3
''(
57
00
m
m
)
8'
10
''(2
70
0m
m
)
10
''(
27
0m
m
)
22’3''(700mm)
6x
29
'6
''(
=
17
7'
1''
)(
6x
90
00
m
m
)
19
'8
''(
60
00
m
m
)
9'1
0'
'(3
00
0m
m
)
10
''(
27
0m
m
)
22
'3
''(
57
00
m
m
)
Figure 5-42 Combination of 219'10" (67m) main boom anchoring rods
To main boom head
To derricking
pulley block
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...