5.5.2.2 Assemble main boom anchoring rods and reeve in hoisting rope
Connect anchoring rods of main boom intermediate sections and anchoring rods of main boom
head with each other by pin spindles and secure them with retaining pins. (The combination of
main boom anchoring rods are detailed in section 5.4.1.2)
Detach derricking traveling block from main boom pivot section, and then connect it to the
assembled main boom anchoring rods. See the figure 5-54.
Figure 5-54 Assembly of main boom anchoring rods
a) Reel off hoisting winch 1, pull the hoisting rope to main boom head and reserve a certain
length of rope for load hook reeving as shown in the figure 5-55.
Figure 5-55 Rope reeving
1. Connect to main boom anchoring
rods
2. Disconnect from main
boom pivot section
Hoisting rope
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...