
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-73
Table 5-17
Components used to assemble fixed jib
No.
Names of the
components
Illustration
1
Pin spindle
(114mm)
4.49"
(6
0mm)
2.
36"
2
Retaining plate
(82mm)
3.23"
1.
1"
(2
8mm)
3
Washer
DIN 137
(12)
4
Bolt
ISO 4017:1999
(M12X45-8.8)
5
Double tapered
pin
5.12"
(130mm)
1.
18"
(30m
m
)
6
Retaining spring
(85mm)
3.35"
d) Assemble main boom anchoring rods according to the length of assembled main boom
(for the details, see Section 5.4.1);
Pre-assemble some fixed jib rear anchoring rods to FA-frame according to the required
angle of fixed jib (for the details, see Section 5.4.2.2).
Connect fixed jib front anchoring rods according to the length of assembled fixed jib (for
the details, see Section 5. 4.2.2).
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...