Installation and User Manual
EtherHaul
1200™
EH-INST-02, Issue 4.0
Page 57
Management/CLI indication: “RF Operational – Up”
Receive Signal Strength Indication (RSSI) achieved in Alignment Mode is
/-5dB of the expected value
Carrier to Interf Noise Ratio (CINR) is 16 or higher
Link configuration (modulation, mode) is in accordance with plan
requirements
5.1.3
Link Errors Test
This inspection verifies error-free operation of the radio link.
No errors/loss on the RF Statistics counters (show rf statistics)
5.1.4
Ethernet Services Test
This inspection verifies correct Ethernet services flow and error-free operation.
Connect PCs on both ends of the link and use software-based utilities to test
for packet-loss
If available, connect a packet analyzer to the GbE port and verify that no
packets are lost
5.1.5
Management Verification
This inspection verifies proper management of the link.
Verify correct management/CLI connection to both local and remote ODUs
Verify management access from remote NMS stations
5.1.6
Recording ODU Configuration
Perform the following steps after the EtherHaul ODU is commissioned and accepted:
Copy the Running Configuration (currently active) to Startup Configuration
Save the configuration file for future records and backup