Installation and User Manual
EtherHaul
1200™
Page 22
EH-INST-02, Issue 4.0
2
Installing the EtherHaul 1200
This chapter describes how to install and perform the basic setup for EtherHaul antenna
outdoor units (ODUs) in an EtherHaul wireless network, including:
Preparing the Site
EtherHaul 1200 Package Contents
Unpacking the EtherHaul 1200
Required Tools
Preparing for Installation
Mounting the EtherHaul 1200
Connecting the Cables
Aligning the Antenna
Performing Initial System Setup
Note:
The installation and maintenance of the EtherHaul 1200 link should only be done by
service personnel who are properly trained and certified to carry out such activities.
2.1
Preparing the Site
Carefully select and prepare each EtherHaul ODU site to make device installation and
configuration as simple and trouble-free as possible. During site selection and
preparation, always consider the long-term needs of both your network and your
applications.
2.1.1
Physical and Environmental Requirements
Each EtherHaul ODU site should adhere to the following requirements:
There must be a clear, unobstructed line-of-sight between ODU nodes.
The EtherHaul ODU must be mounted on a fixed, stable, permanent
structure. A reinforced steel mounting pole is required, with a diameter
measuring from 2-4 inches (5-10 centimeters).
Caution:
Do not mount the EtherHaul device on a structure that is temporary or easily moved.
Doing so may result in poor service or equipment damage.
The EtherHaul ODU must be mounted in a site that is easily accessible to
authorized personnel, and only authorized personnel.
Operating Temperature – -45° ÷ +55°C