Installation and User Manual
EtherHaul
1200™
Page 24
EH-INST-02, Issue 4.0
Package
Description
Quantity
Unit Grounding Cable (90 cm)
1
DC Cable Terminal Block Connector
1
EtherHaul 1200
Mounting Assembly
EtherHaul 1200 Mounting Assembly
1
You must examine all EtherHaul package contents carefully upon arrival. If a component
is missing or damaged, contact your EtherHaul distributor before attempting to install
the equipment.
2.3
Unpacking the EtherHaul 1200
When you unpack the components of the EtherHaul 1200, it is important to use care so
as to avoid damaging or scratching the antenna radome:
Do not touch the radome when unpacking the ODU.
Do not rest the ODU face down or touch the radome. It is crucial to prevent
contact between the radome and other objects.
2.4
Required Tools
Ensure that you have the following tools with you when performing an EtherHaul
installation:
Standard handheld digital voltage meter (DVM) with probes
Standard open-end wrench, 13 millimeter
Philips screwdriver (medium size head for grounding connection)
8mm Allen key for ODU installation with 2ft antenna
Cable ties (for securing network and optional power cables)
Cutter
Cable labeling
2.5
Preparing for Installation
EtherHaul units must be installed in pairs, working with two technicians. One
technician must be located at each node, in order to align and calibrate each
antenna ODU with its remote node pair for best performance.
The expected receive signal strength for each antenna ODU (read from the
DVM) must be calculated prior to installation, based on the network link
budget.