2-6
Additional Installation Details
Date Code 990215
SEL-351P Manual Técnico
DWG: M351P029
R
E
C
L
O
S
E
R
SEL-351P
120 Vac
Power
VS
VC
VB
VA
1
3
Source
Load
Control
Cable
(120 Vac
Power)
Figure SECTION 2: .2:
Installation with Separate 120 Vac Power and Three-Phase
Voltage
DWG: M351P030
R
E
C
L
O
S
E
R
SEL-351P
120 Vac
Power
VS
VC
VB
VA
1
3
Source
Load
Control
Cable
(120 Vac
Power)
1
Figure SECTION 2: .3:
Installation with Separate 120 Vac Power, Three-Phase, and
Synchronism Check Voltage
Содержание SEL-351P
Страница 6: ......
Страница 92: ......
Страница 96: ......
Страница 154: ......
Страница 156: ......
Страница 222: ......
Страница 258: ......
Страница 262: ......
Страница 278: ...5 16 Trip and Target Logic Date Code 990215 SEL 351P Manual Técnico Figure SECTION 5 6 POTT Logic ...
Страница 284: ...5 22 Trip and Target Logic Date Code 990215 SEL 351P Manual Técnico Figure SECTION 5 10 DCUB Logic ...
Страница 324: ......
Страница 368: ......
Страница 406: ......
Страница 482: ......
Страница 534: ......
Страница 539: ......
Страница 549: ......
Страница 551: ......
Страница 587: ......
Страница 597: ......
Страница 601: ......
Страница 603: ......
Страница 609: ......
Страница 621: ......
Страница 635: ......
Страница 649: ......
Страница 663: ...H 14 Distributed Network Protocol DNP V3 00 Date Code 991201 SEL 351P Manual Técnico Enter the new DNP Binary map CR ...
Страница 665: ......
Страница 671: ......