226 • Appendix H: 10.0 eV/Benzene PID Sensor
GX-6000 Operator’s Manual
3 . The pump will stop and the instrument will prompt you to install the filter tube and
tube holder.
4 . Be sure a filter tube is installed in the tube holder and then attach the tube holder to
the instrument’s inlet fitting. See “Replacing a Tube” on page 229 for instructions.
5 . Press and release the POWER/ENTER button to enter the TUBE CAL Menu.
6 . Screw the demand flow regulator onto the benzene calibration cylinder.
7 . Attach the calibration tubing to the demand flow regulator.
8 . Attach the other end of the calibration tubing to the tube holder’s inlet fitting.
9 . Use the SHIFT
▼
(PANIC) button to place the cursor next to
SINGLE CAL
.
10 . Press and release the POWER/ENTER button.
CAL
INSTALL TUBE
AND HOLDER
YES :ENTER
NO :DISP
TUBE CAL
GAS CALIBRATION
AUTO CAL
SINGLE CAL
ESCAPE