212 • Appendix H: 10.0 eV/Benzene PID Sensor
GX-6000 Operator’s Manual
3 . The pump will stop and the instrument will prompt you to install the filter tube and
tube holder.
4 . Be sure a filter tube is installed in the tube holder and then attach the tube holder to
the instrument’s inlet fitting. See “Replacing a Tube” on page 229 for instructions.
5 . Press and release the POWER/ENTER button to confirm the tube and holder have
been installed.
6 . You will be prompted to start a benzene measurement.
7 . Press and release the POWER/ENTER button to start the benzene measurement.
8 . The benzene reading is displayed at the top of the screen. An automatically-
determined, temperature-based countdown is displayed at the bottom of the screen.
The number to the left of the countdown (“5” in the example below) is the
temperature code.
TUBE
INSTALL TUBE
AND HOLDER
YES :ENTER
NO :DISP
TUBE
START
MEASUREMENT
YES :ENTER
NO :DISP
TUBE
BNZ
MEASURING
EXIT :RESET
5 45SEC
0.00
ppm