300
Maintenance
5. If you have installed a new graphite tube, perform the procedure outlined in
Conditioning the graphite tube on page 305.
If you are reusing a previously conditioned graphite tube, heat manually at
2500 °C for 5 seconds to remove surface contamination.
6. Every time you open the furnace, subsequently always heat it out manually at
2500 °C for approximately 5 seconds.
7. Check alignment of the furnace (see Aligning the Graphite Furnace on page
8. Check alignment of the furnace autosampler (see To Align the Autosampler
Tip in the Graphite Tube on page 145).
Cleaning the graphite tube and graphite contacts
Good, reproducible analytical results depend on good electrical contact between
the graphite contacts and the graphite tube. The contact surfaces of the graphite
tube and the graphite contacts must be smooth and clean to allow good electrical
contact.
After prolonged use the graphite contacts may become contaminated with
remnants of samples and small particles of graphite. Even quite small particles
can spoil the contact and cause poor analytical results.
Every time that you open the furnace, clean the contacts as described in
Cleaning the contact surfaces of the graphite tube and contacts on page 301.
Note
Do not touch the graphite tube or contacts with your fingers. Perspiration
can affect the tube lifetime and the analytical results by contaminating and
damaging the surface of the graphite.
If a graphite tube breaks inside the furnace you must remove all the
remnants and thoroughly clean the contacts.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......