306
Maintenance
value is too high for this element, heat the tube manually at 2500 °C for 10
seconds and then repeat the ‘dry fire’.
To enter the temperature manually and heat the furnace:
1. On the Toolbar, click on
Furnace Control
.
2. In the Furnace Control window, click on the
Cleanout Temp.
entry field and
type the required temperature (e.g. 2400 °C).
3. Click on
Start
to heat the furnace.
The furnace is heated to the selected temperature and continues to heat until
you stop it.
4. After about 10 s, click on
Start
again to stop furnace heating.
Changing the graphite contacts
Change the graphite contacts when one or both contacts are badly contaminated.
Contacts should be changed on a routine basis. Always change both contacts at
the same time.
Summary of the procedure
Always change the graphite contacts in the following sequence:
1. Open the furnace and remove the graphite tube (see
).
Warning: High Temperatures – Risk of Burns
The graphite furnace can generate very high temperatures. Do
not
touch
any parts of the furnace, especially the graphite components, until they
have cooled to room temperature.
Note
Do not heat the graphite furnace for longer than about 10 seconds when the
temperature exceeds 2000 °C. Heating for longer periods will markedly
reduce the lifetime of the graphite tube.
!
Warning
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......