48
Preparing Your Laboratory
It is essential to avoid ground loops.
Power Consumption:
10100 VA for the PinAAcle 900T and the PinAAcle 900Z
10100 VA for the PinAAcle 900H
800 VA for the PinAAcle 900F
140 VA for the Cooling System
Power Specification PinAAcle 900T and PinAAcle 900Z
230 VAC
10%, 50 or 60 Hz ± 0.3 Hz, single phase alternating current.
The PinAAcle 900T and 900Z will ship standard an IEC 60309 32A power
connector.
Operating range of 207 - 253 VAC/60 Hz, 30 A
(2 pole- 3 wire-grounding), and a dedicated circuit.
fuse 30 A slow blow, must be able to hold a 3x surge current for 3 seconds.
The mains line house wiring must have a minimum wire cross section of 6 mm
²
(8 gauge) or 10 mm
²
(6 gauge) for distances > 10 m.
Power Specification PinAAcle 900H
230 VAC
10%, 50 or 60 Hz ± 0.3 Hz, single phase alternating current.
The PinAAcle 900H will ship standard an IEC 60309 16/20 A power connector.
Operating range of 207 - 253 VAC/60 Hz, 20 A
('2 pole- 3 wire-grounding), and a dedicated circuit.
fuse 20 A slow blow, must be able to hold a 3x surge current for 3 seconds.
The mains line house wiring must have a minimum wire cross section of 4 mm²
(10 gauge) or 6 mm² (8 gauge) for distances > 10 m.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......