291
Graphite Furnace Maintenance for the PinAAcle 900T/900Z
Contact Cycles
Use this value to show the number of times that the furnace has been used since the
contacts were changed.
Click on
Reset
to reset the value to zero when you install new graphite contacts.
Check the Display warning message when cycles exceed check box to have a
warning message displayed when an analysis is started and the contact cycles have
exceeded a user specified number. The warning message will not prohibit a user
from performing an analysis, but rather serves as a reminder to the user that the
contacts should be inspected and, if necessary, replaced.
Conditioning the Graphite Tube
We recommend that you run the graphite tube conditioning program every time
that you change the graphite tube or platform. The conditioning procedure
removes adsorbed gases and surface contamination from the graphite, and
ensures reproducible performance.
After conditioning, it is good practice to verify that the tube and/or platform are
sufficiently clean for the element you wish to determine.
In order to do this, run your method for this element, but do not inject a sample.
Perform a ‘dry fire’ instead. Evaluate the results obtained. If the absorbance
value is too high for this element, heat the tube manually at 2500 °C for 10
seconds (see
Manually Heating the Graphite Tube on page 292
) and then repeat
the "dry fire".
You may need to repeat this a few cycles to remove the contaminants
completely. Otherwise, change to a new tube.
1. On the
Toolbar
, click on
Furnace
.
2. In the
Furnace
Control
window, click on
Condition Tube
.
The system uses a special furnace program to heat the tube to successively
higher temperatures.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......