248
Maintenance
1. Take the burner system apart.
2. Inspect the large o-ring located in the neck of the burner chamber. Carefully
lever the o-ring out of the neck of the burner chamber using a plastic pipette tip
or the like.
3. Place the large o-ring back into the neck of the burner chamber and press it
down with your finger.
4. Inspect the four smaller o-rings and the large o-ring located in the burner end
cap. Very carefully pry them out and inspect the o-rings for nicks, cuts and
deterioration . Replace the o-rings as needed.
5. Examine the o-rings. If they are is damaged, replace them.
6. Gently place the o-rings back into the end cap and then press them into place
with your finger.
7. Reassemble the burner system.
Nebulizer O-Rings
There are o-rings on the nebulizer. Always carefully check the condition of these
o-rings whenever you take the nebulizer apart.
Warning: Flammable Gases - Fire and Explosion Hazard
If the o-rings in the burner system are damaged or have deteriorated, they
may no longer form a proper seal. This may result in a gas leak which is
a serious fire hazard.
Check the condition of the o-rings regularly and replace them if they are
damaged or show signs of deterioration.
Note
Never
use sharp or pointed tools to remove the o-ring. Examine the o-ring.
If it is damaged, replace it.
!
Warning
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......