131
Connecting the Drain System to the Burner
3. Take the other end of the drain hose, where the drain float assembly is located,
and secure it to the drain waste bottle (Carboy 15L).
4. Connect the drain interlock.
5. Before connecting the drain tube to the burner assembly, pour about 250 mL
of water into the free end of the drain tube to fill the drain loop and to activate
the drain float. Both the Air pressure and Drain interlocks will be activated
until the magnetic sensor is engaged. Both interlocks should clear once the
drain float is filled with water.
Preconditioning A Drain Tube
In order for a new sample introduction system to aspirate and drain smoothly,
the internal surfaces must be preconditioned.
•
Aspirate for 5 minutes a 1+1 solution of methanol in water.
Adding Water to the Drain Trap
The drain vessel includes an internal trap to make certain that burner gases cannot
escape into the drain vessel. Enough water must be present in the drain system to
fill the drain loop and to activate the drain float. If not, carry out the following
procedure:
1. Open the compartment door.
2. Remove the clamp around the drain tube.
Note
The safety interlock connection goes to the instrument. Until you
precondition the drain tube, a drain and air pressure interlock error
message will appear on the computer. See the following procedure to
satisfy the drain interlock.
Note
You must perform this procedure directly after installation of a new burner
system and you should repeat it if you replace the drain tube or any of the
sample introduction component.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......