229
Drain System Maintenance
5. Disconnect the drain tubing from both the drain vessel and the drain outlet on
the burner end cap by loosening the clamps on each end of the tubing. Once the
clamps are loosened, the tubing should easily pull out.
6. Place the new piece of drain tubing (Part No. 02507987) next to the drain
interlock cable and carefully rewrap the spiral wrap around them both.
7. Place the drain clamp on the upper end of the new drain tubing. Then attach the
tubing to the drain outlet on the burner end cap. Tighten the clamp securely.
8. Place the other drain clamp on the lower end of the drain tubing. Then attach
the tubing to the drain trap switch assembly. Tighten the clamp securely.
9. Plug the drain interlock connector into the receptacle under the burner. Make
sure the interlock connector is plugged in all the way.
Preparing the New Drain Tubing for Use on page 229
Preparing the New Drain Tubing for Use
In order for the sample introduction system to drain smoothly, the internal surface
of the new drain tube needs to be prepared. This is easily accomplished when you:
1. Aspirate a 50/50 solution of water and methanol for approximately 5 minutes.
2. Replacement and preparation is now complete.
Adding Water to the Drain Float Assembly
Enough water must be present in the drain system to fill the drain loop and to
activate the drain float assembly. If not, carry out the following procedure:
1. Loosen the drain clamp and remove the drain tubing from the drain outlet on
the burner end cap.
2. Pour about 250 mL of water into the drain tubing.
Note
This important procedure MUST be performed at this point of the drain
tube replacement process.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......