108
Installation
Install the spectrometer by following exactly the procedures described in this
chapter, as summarized in the steps below.
1. Prepare the new site for the spectrometer; see Chapter 2,
.
2. Connect the burner and furnace gas supplies.
3. Connect the drain system to the burner.
4. Install the furnace autosampler.
5. Connect the cooling system for the graphite furnace.
6. Make sure that the main power switches of all the instruments are in the off
position, then connect the electrical cables.
Connecting the Burner Gases
The connectors for the burner gases are located on the rear panel of the
spectrometer.
What you need to provide
•
Suitable supplies of acetylene, air, and nitrous oxide. The gases must conform
with the requirements listed in Chapter 2,
Preparing Your Laboratory on page
.
•
Suitable pressure regulators and on/off valves near to the spectrometer for the
gas supplies.
The gas supply systems must comply with your local safety regulations. Also refer
to the information given under
.
Note
The instrument ships with the nebulizer in place based on the part number
configuration ordered (a stainless steel or high sensitivity corrosion
resistant plastic nebulizer).
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......