Shipping List for the PinAAcle 900H ...............................................158
Shipping List for the PinAAcle 900T ...............................................160
Shipping List for the PinAAcle 900Z ...............................................163
Chapter 5. Preparing the System ...................................... 165
Switching on the System ...................................................................165
Installing the Lamps ..........................................................................168
Lamp Compartment ....................................................................169
Installing and Connecting HCLs .................................................170
Electrodeless Discharge Lamps (EDL) .......................................170
Installing and Connecting EDLs .................................................170
Removing lamps .........................................................................172
Tips for installing lamps .............................................................172
Installing Sample Trays ....................................................................173
To remove the tray ......................................................................176
Setting up the System for Analyses Using the Flame Technique .....176
Setting Up the Burner System ....................................................176
Safety Checks for the Flame Technique .....................................177
Igniting the Flame .......................................................................178
Extinguishing the Flame .............................................................179
Locking the Furnace Cover in Place ...........................................181
Setting up the Analysis ...............................................................183
To use the furnace .......................................................................184
Aligning the Graphite Furnace ...................................................186
Setting up the AS 900 Autosampler .................................................190
Shutting Down the System ...............................................................191
To shut down the flame system ..................................................191
To shut down the furnace system ...............................................191
To shut down the spectrometer ...................................................191
Emergency Shutdown .................................................................192
Chapter 6. Maintenance ..................................................... 195
Introduction .......................................................................................195
General Maintenance Checklist ........................................................196
Instrument Maintenance Checklist ...................................................197
Cleaning the Instrument ....................................................................198
Checks ...............................................................................................198
Periodic Checks ..........................................................................198
Burner Maintenance Checklist ..........................................................199
Spectrometer Maintenance Checklists ..............................................202
Changing the Air Filter .....................................................................203
Changing the Vent Filter ...................................................................205
Changing the Fuses ...........................................................................206
Cleaning the Burner Chamber ..........................................................208
Cleaning the Burner Chamber After Use With
Organic Solvents .........................................................................211
Cleaning the Burner Chamber After Aspirating Solutions
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......