271
Graphite Furnace Maintenance for the PinAAcle 900T/900Z
2. In the Furnace Control window click
Open/Close
and remove the graphite
tube using the tube insertion/removal tool, and then tilt the furnace forward .
3. Switch off the spectrometer at the operational on/off switch at the front of the
instrument.
Tilting the Graphite Furnace Forward
You must open the furnace to install or change the graphite tube, and also to clean
inside the graphite contacts.
1. Extinguish the flame, turn off the gases, and switch off the instrument. Let the
burner head cool. Open the Sample Introduction compartment door.
2. Loosen the furnace locking screw all the way. See the figure
Graphite Furnace Back Into Position on page 296
3. Grasp the graphite furnace with both hands and carefully tilt it forward.
Support its weight until it reaches the end stop. Never allow the graphite
furnace to swing down with force. This will damage the furnace assembly and
the base of the instrument.
Warning: High Temperatures – Risk of Burns
The graphite furnace can generate very high temperatures. Do
not
touch
any parts of the furnace, especially the graphite components, until they
have cooled to room temperature.
Caution
Risk of damage to instrument.
The graphite furnace is heavy. Grasp it firmly as you tilt it and support its
weight until it reaches the end stop.
!
Warning
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......