315
Graphite Furnace Maintenance for the PinAAcle 900H
To install the right-hand contact:
1. Slide the short arm of the plastic alignment gauge and the replacement right-
hand (long) contact onto the bolt, so that the contact fits in the ring in the gauge
and the lug in the ring inserts into the sample introduction port of the contact.
2. Pass the bolt from the internal side through the right-hand furnace block and
out through the window cavity so that the long arm of the alignment gauge rests
against the furnace block.
3. Screw the traction nut with its short side toward the furnace block onto the free
end of the bolt. Position the traction nut so that the flat side on the rim passes
under the optical sensor.
4. Carefully turn the bolt clockwise with the ratchet wrench to draw the contact
into the furnace block.
Make certain that the contact is not tilted.
5. Disassemble and remove the installation tool. Take care not to scratch or
damage the contact.
Note
Take care not to damage the optical sensor.
Note
Draw the contact firmly into place, but do not apply excessive force
otherwise the contact may shatter..
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......