327
Replacement Parts
Checking the inlet valve
1. Start a rinse cycle by clicking on the Flush button.
2. Remove the rinse feed tube briefly from the rinsing liquid so that an air bubble
is drawn in and then replace the tube in the rinsing liquid.
3. Watch the meniscus of the air bubble: It must remain stationary during the
expulsion phase of each cycle (pump plunger moves forward).
4. When you have finished checking the outlet valve, in the In the
Furnace
Control
window, click on
Align Tip
.
5. In this dialog (see the previous screen shot), click on
Set the depth of the
autosampler tip in the sampling cup
. Select
Use the rinse location
and then
select
Next
.
6. Adjust the depth control wheel so that the pipet tip is at the correct depth inside
the rinsing port. Then click on
Finish
.
Replacement Parts
Every day you count on PerkinElmer to provide you with solutions that deliver
reliable performance, control operating costs and maximize operational time. Our
complete portfolio of consumables, parts, supplies, training and service helps you
meet both routine and demanding measurement challenges. We invest heavily in
testing and validating our products to ensure you receive guaranteed compatibility
and performance-on-time, every time, for every instrument in your laboratory.
Supplies, replacement parts, and accessories can be ordered directly from
PerkinElmer, using the part numbers quoted in the guides provided with the
instrument.
See our website:
http://perkinelmer.com
Note
Do not attempt to take the valves apart or repair the valves or to
change individual components inside a valve.
If repeated flushing does
not remedy a leaking valve, discard the valve and install a complete, new
valve.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......