3
Environmental Conditions
accessory is recommended for the removal of any moisture from the purge
gases.
•
Before the instrument is installed, the area around, under and behind the
instrument's planned location is to be cleared of any dirt and dust to
prevent their entry into the instrument's interior which could cause a
negative effect on performance.
•
Do
not
position the instrument so that it is difficult to disconnect the mains
power switch on the rear panel.
•
Keep the work area scrupulously clean to avoid contaminating your
samples and to maintain a safe working environment. Clean up spilled
chemicals immediately and dispose of them properly.
•
Do
not
allow smoking in the work area. Smoking is a source of significant
contamination and also a potential route for ingesting harmful chemicals.
•
Do
not
store, handle, or consume food in the work area.
•
When you remove the instrument from storage and before you put it into
operation, allow it to stand for at least a day under the approved operating
conditions.
Environmental Conditions
The instrument will operate correctly under the following conditions:
•
Indoors.
•
Ambient tempe10
C to +35
C (+50
F to +95
F), with a
maximum change not exceeding 2.8
C (5
F) per hour.
•
Safe temperature range: +5
C to +40
C (+41
F to +104
F).
•
Ambient relative humidity: 20% to 80%, without condensation.
•
Altitude: in the range -400 m to 2000 m (-1300 to 6500 feet).
•
The location must be free of dust, smoke, and corrosive fumes.
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......