215
Cleaning the Burner Head
8. Close the atomizer compartment door.
Complete Cleaning Procedure
If the quick cleaning procedure, above, fails to remove deposits or if you wish to
clean the burner head more thoroughly, see
Changing the Fuses on page 206
Checking the Slot Width
Over time, the burner slot becomes wider due to abrasion. The level of abrasion
depends on the types of solutions you are aspirating. A burner slot that is too wide
causes unstable flame conditions and, in the worst case, may cause a flashback of
the flame. For this reason you should check the width of the burner slot at regular
intervals.
A set of feeler gauges is required to check the slot width. The table below specifies
the correct slot width and the feeler gauge required for checking.
To check the slot width:
1. Carefully slide the specified feeler gauge through the length of the burner slot.
2. The gauge must fit tightly in the slot.
3. The slot is too wide if the gauge is loose along the slot. If the slot is too wide,
replace the burner head with a new one.
Table 6-1.
Slot Width and Feeler Gauge
Burner Head
Slot Width
Tolerance
Feeler Gauge
for check
air-acetylene
0.65 mm
(0.026 inch)
0.075/-0.025 mm
(
0.003/-0.001 inch)
0.7 mm
(0.030 inch)
N
2
O-acetylene
0.5 mm
(0.020 inch)
0.025 mm
(
0.001 inch)
0.5 mm
(0.020 inch)
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......