296
Maintenance
5. Reassemble the windows. New seals and windows are available.
6. Screw the windows in the furnace.
To Refit the Windows
1. Screw each window carefully into the ends of the furnace; make sure that the
threads are properly engaged.
The windows are designed to be slightly offset from the vertical.
2. Tilt the furnace back into its original position and tighten the furnace locking
screw to lock the furnace into place (see
Tilting the Graphite Furnace Back
).
Tilting the Graphite Furnace Back Into Position
1. Once all the maintenance procedures are completed, carefully tilt the furnace
back into to its original position. See the figure
2. Tighten the furnace locking screw to lock the furnace into place.
3. Close the Sample Introduction compartment door.
4. Switch on the instrument, turn on the gases and restore the flame.
Graphite Furnace Maintenance for the PinAAcle 900H
Open the Furnace and Remove the Graphite Tube
You must open the furnace to install or change the graphite tube, and also to clean
inside the graphite contacts.
Warning: High Temperatures – Risk of Burns
The graphite furnace can generate very high temperatures. Do
not
touch
any parts of the furnace, especially the graphite components, until they
have cooled to room temperature.
!
Warning
Содержание PINAACLE 900 Series
Страница 1: ...PINAACLE 900 SERIES Customer Hardware and Service Guide ATOMIC SPECTROSCOPY...
Страница 2: ......
Страница 3: ...PinAAcle 900 Series Customer Hardware and Service Guide...
Страница 26: ...10 Safety Practices Burner Locking Mechanism Label Item Description 1 Press button to unlock the lever 1...
Страница 52: ...36 Safety Practices...
Страница 55: ...39 Lab Space Requirements Dimensions and Weights Figure 2 1 Instrument dimenstions...
Страница 84: ...68 Preparing Your Laboratory...
Страница 91: ...75 The PinAAcle 900 Series Spectrometer System Figure 3 2 Optical System for the PinAAcle 900H...
Страница 92: ...76 System Description Figure 3 3 Optical System for the PinAAcle 900T...
Страница 93: ...77 The PinAAcle 900 Series Spectrometer System Figure 3 4 Optical System for the PinAAcle 900Z...
Страница 101: ...85 Burner Assembly System Figure 3 8 Block diagram of the burner system...
Страница 210: ...194 Preparing the System...
Страница 278: ...262 Maintenance Figure 6 31 Insertion removal tools Item Description 1 Graphite tube holder insertion removal tool 1...
Страница 310: ...294 Maintenance Figure 6 54 Window key Item Description 1 Window key 1...
Страница 354: ...338 Maintenance...
Страница 388: ...I 6 Index W WEEE Instructions 34 Weights 39 Windows cleaning 321 refitting 320 removing 318...
Страница 389: ......