17. Heating or cooling module
109
Installation
Contact the HVAC installer prior to commencing the installation process. The installer will provide the heating or cooling
system with control valves (e.g. electronic valves at 230 Vac or 24 Vdc on the heating manifold or radiator) and will verify
which type of contact to use for the connection of the central boiler or cooling unit. Furthermore, the installer will ensure
that the central boiler or cooling unit (boiler, control or telephone contact, etc.) or the circulation pump can be connected.
Contact the manufacturer of these systems for more information on how to properly adjust the settings.
Connection diagrams
installation with central heating boiler
L
N
underfloor heating
radiator
heating unit
bypass
*
*
*
*
*
*
*
*
*
*
*
*
OR
boiler contact
* to be supplied by the heating installer
mixed circuit
or SELV circuit, 12 Vdc/24 Vdc
electronic valve
manifold
Содержание 550-00001
Страница 1: ...Installation Manual Niko Home Control...
Страница 17: ...16 3 Power supply Installation Connection diagram N L 230V...
Страница 65: ...64 9 Electricity measuring modules Measuring one or several switching circuits 230V L N 0 3 0 9 1 7 kWh L K...
Страница 122: ...20 Digital potential free sensor module 121 Installation Connection diagram ALARM 350 10032...