Part 8: Review on Replacement of Optional Peripheral Equipment
8 - 44
b) Mounting MR-BAT6V1
BAT1
Securely mount an MR-BAT6V1 to the BAT1 holder.
CON1
Click
Insert the MR-BAT6V1 connector mounted on BAT1
holder to CON1.
Confirm the click sound at this point.
The connector has to be connected in the right direction.
If the connector is pushed forcefully in the incorrect
direction, the connector will break.
Place the MR-BAT6V1 lead wire to the duct designed to
store lead wires.
Insert MR-BAT6V1 to the holder in the same procedure in
the order from BAT2 to BAT5.
Bring out the lead wire from the space between the ribs, and bend it as
shown above to store it in the duct. Connect the lead wire to the
connector. Be careful not to get the lead wire caught in the case or
other parts.
When the lead wire is damaged, external short circuit may occur, and
the battery can become hot.
Содержание Melservo MR-J3-100B
Страница 17: ...8 MEMO ...
Страница 18: ...Part 1 Summary of MR J3 MR J3W Replacement 1 1 Part 1 Summary of MR J3 MR J3W Replacement ...
Страница 145: ...Part 3 Review on Replacement of MR J3 _B_ with MR J4 _B_ 3 48 MEMO ...
Страница 146: ...Part 4 Replacement of MR J3W _B with MR J4W2 _B 4 1 Part 4 Review on Replacement of MR J3W _B with MR J4W2 _B ...
Страница 195: ...Part 4 Replacement of MR J3W _B with MR J4W2 _B 4 50 MEMO ...
Страница 196: ...Part 5 Review on Replacement of MR J3 DU_ with MR J4 DU_ 5 1 Part 5 Review on Replacement of MR J3 DU_ with MR J4 DU_ ...
Страница 277: ...Part 5 Review on Replacement of MR J3 DU_ with MR J4 DU_ 5 82 MEMO ...
Страница 278: ...Part 6 Common Reference Material 6 1 Part 6 Common Reference Material ...
Страница 418: ...Part 7 Review on Replacement of Motor 7 1 Part 7 Review on Replacement of Motor ...
Страница 564: ...Part 9 Startup Procedure Manual 9 1 Part 9 Startup Procedure Manual ...
Страница 567: ...Part 9 Startup Procedure Manual 9 4 MEMO ...
Страница 589: ...L NA 03127ENG C ...