Page 5-66
200 BENCH PROCEDURES
Installation of Drive Hub
(V-MAC Engines)
DRIVE COUPLING REMOVAL
A metal two-piece style drive coupling was
introduced into production on certified E7 V-MAC
engines built after July 1, 1992 — beginning with
serial No. 2P and above. When the Celeron drive
coupling requires replacement, replace with the
two-piece style drive coupling.
Refer to Figure 5-79.
1. Using injection pump drive coupling holder
J 28452-A, securely hold injection pump
outer coupling from turning while loosening
coupling retaining nut. Remove outer
coupling.
Figure 5-79 — Loosening Coupling Retaining Nut
Refer to Figure 5-80.
2. Remove coupling (inner hub) retaining nut
and washer.
Figure 5-80 — Removing Retaining Nut and Washer
Refer to Figure 5-81.
3. Using a suitable two- or three-jaw puller,
remove the inner hub from the injection
pump camshaft.
Figure 5-81 — Removing Inner Hub
DRIVE COUPLING INSTALLATION
1. Install inner hub on injection pump camshaft.
Do not install a key in injection pump camshaft.
Keying of drive coupling (inner hub) to injection
pump camshaft is not required and, if used, may
result in damage.
2. Install coupling (inner hub) washer and
retaining nut. Hand tighten.
3. Insert outer coupling on inner hub so hub-
holding tool can be used to hold inner hub.
The coupling may be installed in either
direction.
A snap ring is installed in the splined bore of the
outer coupling. Its function is to keep the outer
coupling in proper position between the injection
pump inner hub and the Econovance mating
gear.
4. Using injection pump drive coupling holder
J 28452-A, securely hold outer coupling.
Torque coupling (inner hub) retaining nut to
200 lb-ft (271 N•m) using torque wrench
J 24407 or equivalent.
200430a
J 28452-A
200431a
200432a
5-101.bk Page 66 Friday, March 17, 2006 11:05 AM
Содержание E7
Страница 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Страница 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Страница 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Страница 7: ...SAFETY INFORMATION Page iii SAFETY INFORMATION front fr5 Page iii Friday March 17 2006 11 04 AM...
Страница 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Страница 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Страница 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Страница 25: ...200 GENERAL INFORMATION Page 1 1 GENERAL INFORMATION 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 59: ...200 ENGINE DISASSEMBLY Page 4 1 ENGINE DISASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Страница 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Страница 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 186: ...Page 6 28 200 ENGINE ASSEMBLY Figure 6 26 Flywheel Housing Bolts 5 101 bk Page 28 Friday March 17 2006 11 05 AM...
Страница 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Страница 241: ...200 SETUP AND ADJUSTMENTS Page 7 1 SETUP AND ADJUSTMENTS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 263: ...200 ENGINE INSTALLATION TESTING Page 8 1 ENGINE INSTALLATION TESTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Страница 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Страница 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Страница 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Страница 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Страница 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...