200 ENGINE ASSEMBLY
Page 6-5
[213 CC] Camshaft Bushings
DESCRIPTION
Lubrication oil is pumped into the cylinder block
main oil gallery. Oil from the gallery flows to each
main bearing bushing bore and then on to the
respective camshaft bushing bore, providing
lubrication for both the crankshaft and camshaft
bushings. Camshaft bushing bores No. 1, 2 and 5
are grooved to supply oil to other components as
well. Oil from the No. 1 camshaft bushing bore
flows on through a drilled passage to lubricate the
front auxiliary driveshaft bushing. Oil from the
No. 2 and 5 camshaft bushing bores flows on
through vertical drilled passages to lubricate the
rocker arm assemblies. Oil from the No. 4
camshaft bushing bore flows through a cast
groove in the cylinder block bushing bore to
lubricate the fuel injection pump, the rear auxiliary
driveshaft bushing, and the air compressor.
INSPECTION
During in-chassis overhaul, check the inside
diameter of the camshaft bushings. If overhauling
out-of-chassis, replace camshaft bushings.
1. Using a telescope gauge or suitable inside
micrometer, measure the ID of each
camshaft bushing in the cylinder block.
Record the dimensions. Refer to Figure 6-4.
Figure 6-4 — Measuring Camshaft Bushing ID
2. Refer to the Fits and Limits chart for
camshaft bushing measurement
specifications. Check the recorded
dimensions against the specifications.
3. If bore size exceeds tolerance or if there is
any evidence of scratching or scoring,
replace the bushings.
REMOVAL
Refer to Figure 6-5.
Use camshaft bushing remover/installer kit
J 37713 (use with J 21428-01 kit) for camshaft
bushing removal.
Camshaft bushings are identified in sequence
from 1 to 7, starting from the front of the engine.
1. Using camshaft bushing remover/installer kit
J 21428-01 (2), with the correct pilot adapter
(J 37713 kit) and a hammer (3), remove the
No. 1 camshaft bushing (4) from the cylinder
block (1).
2. Remove the remaining six bushings in
sequence.
Figure 6-5 — Camshaft Bushing Removal
1. Cylinder block
2. Camshaft bushing
remover/installer
(J 21428-01 kit)
3. Hammer
4. No. 1 camshaft bushing
200319a
1
2
3
4
5-101.bk Page 5 Friday, March 17, 2006 11:05 AM
Содержание E7
Страница 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Страница 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Страница 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Страница 7: ...SAFETY INFORMATION Page iii SAFETY INFORMATION front fr5 Page iii Friday March 17 2006 11 04 AM...
Страница 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Страница 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Страница 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Страница 25: ...200 GENERAL INFORMATION Page 1 1 GENERAL INFORMATION 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 59: ...200 ENGINE DISASSEMBLY Page 4 1 ENGINE DISASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Страница 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Страница 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 186: ...Page 6 28 200 ENGINE ASSEMBLY Figure 6 26 Flywheel Housing Bolts 5 101 bk Page 28 Friday March 17 2006 11 05 AM...
Страница 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Страница 241: ...200 SETUP AND ADJUSTMENTS Page 7 1 SETUP AND ADJUSTMENTS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 263: ...200 ENGINE INSTALLATION TESTING Page 8 1 ENGINE INSTALLATION TESTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Страница 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Страница 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Страница 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Страница 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Страница 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...