![Mack E7 Скачать руководство пользователя страница 112](http://html1.mh-extra.com/html/mack/e7/e7_service-manual_3065456112.webp)
Page 5-22
200 BENCH PROCEDURES
Figure 5-21 — Camshaft Gear Installation
9. Using a suitable press cup, press the gear
onto the shaft until it is fully seated. The
pressure gauge on the press should read
approximately 5 tons (4.54 MT) as the gear
is being pressed on. As the gear seats, allow
the pressure to climb to, but not exceed,
10 tons (9.1 MT). This will ensure that gear
is seated firmly on shaft.
10. When gear is properly seated, clearance
between rear face of gear and thrust washer
should be between 0.003–0.012 inch
(0.076–0.305 mm).
11. Thoroughly clean and degrease injection
pump driving gear with a suitable contact
cleaner that dries rapidly and leaves no
residue.
12. Prepare the gear bore surface with
Locquic™ Primer T, or equivalent.
13. Apply a bead of Loctite 609, or equivalent, to
the gear bore.
14. Using a clean brush, spread Loctite 609
evenly on the entire surface of the gear
bore.
15. Position gear onto camshaft.
16. Using a suitable press cup, press the gear
onto the shaft until it is fully seated. The
pressure gauge on the press should read
approximately 5 tons (4.54 MT) as the gear
is being pressed on. As the gear seats, allow
the pressure to climb to, but not exceed,
10 tons (9.1 MT). This will ensure that gear
is seated firmly on shaft. The gear should be
flush with the end of the shaft when fully
seated.
Figure 5-22 — Fuel Injection Pump Driving Gear
Installation
[213 EV] CYLINDER HEADS
Description
Refer to Figure 5-23.
The cylinder heads featured on 1991 and later E7
engines incorporate internal design modifications
that increase the swirl level of combustion air. To
achieve the increase in air motion required, it was
necessary to redesign the inlet port. Increased air
motion, in conjunction with the eight-hole Valve
Covering Orifice (VCO) nozzle tips, provides
proper air/fuel atomization in the deeper bowl of
the piston crown.
1991 and later E7 cylinder heads are NOT
interchangeable with 1989/1990 E7 cylinder
heads.
5-101.bk Page 22 Friday, March 17, 2006 11:05 AM
Содержание E7
Страница 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Страница 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Страница 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Страница 7: ...SAFETY INFORMATION Page iii SAFETY INFORMATION front fr5 Page iii Friday March 17 2006 11 04 AM...
Страница 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Страница 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Страница 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Страница 25: ...200 GENERAL INFORMATION Page 1 1 GENERAL INFORMATION 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 59: ...200 ENGINE DISASSEMBLY Page 4 1 ENGINE DISASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Страница 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Страница 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 186: ...Page 6 28 200 ENGINE ASSEMBLY Figure 6 26 Flywheel Housing Bolts 5 101 bk Page 28 Friday March 17 2006 11 05 AM...
Страница 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Страница 241: ...200 SETUP AND ADJUSTMENTS Page 7 1 SETUP AND ADJUSTMENTS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 263: ...200 ENGINE INSTALLATION TESTING Page 8 1 ENGINE INSTALLATION TESTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Страница 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Страница 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Страница 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Страница 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Страница 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...