200 BENCH PROCEDURES
Page 5-29
Refer to Figure 5-31.
3. Place alignment fixture (1) over the cutter
base (2) to ensure proper positioning. With
fixture in place, tighten wing nuts on hold-
down capscrews. Remove alignment fixture.
Figure 5-31 — Alignment Fixture Placement
Refer to Figure 5-32.
The desired finished fire ring groove depth is
0.008 inch (0.203 mm).
4. Install cutter head J 37719 (1) on cutter base
(4).
a.
If fire ring groove (3) is visible, check
existing fire ring groove depth
dimension with depth gauge J 26948.
The difference between 0.008 inch and
the actual remaining depth of fire ring
groove is the amount to cut. Insert two
appropriate thickness gauges (2)
between cutter head (1) and cutter
base (4).
b.
If fire ring groove (3) is not visible,
insert two 0.008-inch thickness gauges
(2) between cutter head (1) and cutter
base (4).
5. Adjust cutter head J 37719 until it bottoms
out on deck surface of existing fire ring
groove. Tighten cutter head in this position
and remove the two thickness gauges.
Figure 5-32 — Setting Cutter Depth
1. Alignment fixture
2. Cutter base
200290a
1
2
1. Cutter head (J 37719)
2. Thickness gauges
3. Fire ring groove
4. Cutter base
200291a
1
2
3
4
5-101.bk Page 29 Friday, March 17, 2006 11:05 AM
Содержание E7
Страница 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Страница 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Страница 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Страница 7: ...SAFETY INFORMATION Page iii SAFETY INFORMATION front fr5 Page iii Friday March 17 2006 11 04 AM...
Страница 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Страница 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Страница 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Страница 25: ...200 GENERAL INFORMATION Page 1 1 GENERAL INFORMATION 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 59: ...200 ENGINE DISASSEMBLY Page 4 1 ENGINE DISASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Страница 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Страница 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 186: ...Page 6 28 200 ENGINE ASSEMBLY Figure 6 26 Flywheel Housing Bolts 5 101 bk Page 28 Friday March 17 2006 11 05 AM...
Страница 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Страница 241: ...200 SETUP AND ADJUSTMENTS Page 7 1 SETUP AND ADJUSTMENTS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 263: ...200 ENGINE INSTALLATION TESTING Page 8 1 ENGINE INSTALLATION TESTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Страница 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Страница 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Страница 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Страница 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Страница 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...