![Mack E7 Скачать руководство пользователя страница 255](http://html1.mh-extra.com/html/mack/e7/e7_service-manual_3065456255.webp)
200 SETUP AND ADJUSTMENTS
Page 7-15
7. To continue the procedures for setting the
timing, refer to the following applications for
an engine with front timing indicator or with
rear timing indicator.
ENGINE WITH FRONT TIMING INDICATOR
E7 mechanically governed engines with
automatic transmissions use the Center Web
Vibration Damper with timing marks. The
vibration damper timing indicator and engine front
turnover bracket are used in this application.
1. Rotate the engine crankshaft counterclock-
wise (as viewed from the front of the engine)
to a minimum of 45 degrees before Top
Dead Center (TDC).
2. Rotate the engine crankshaft clockwise until
lamps A and B are both lit. Fuel injection
pump-to-engine timing is now set and the
injection pump can be removed from the
engine.
ENGINE WITH REAR TIMING INDICATOR
E7 mechanically governed engines with manual
transmissions and all V-MAC engines with
manual and automatic transmissions use the
flatback vibration damper with no timing marks.
They are also equipped with flywheel and
flywheel housings that incorporate engine timing
and turnover features. With rear timing, the front
timing indicator and engine front turnover bracket
are not utilized.
1. Remove all six 8-mm capscrews to access
the flywheel housing timing window.
2. Remove the plastic plug in the cast-
machined opening in the forward face of the
housing.
3. Insert engine barring socket tool J 38587
into the opening.
4. Install a 1/2-inch drive ratchet into tool
J 38587 to rotate the flywheel.
5. Rotate the flywheel counterclockwise to a
minimum of 45 degrees before TDC.
6. Rotate the flywheel clockwise in normal
direction (as viewed from the front of the
engine), until lamps A and B are both lit.
Fuel injection pump-to-engine timing is now
set and the injection pump can be removed
from the engine. Remove tool J 38587 from
the flywheel housing.
Fuel Injection Pump Driven Gear
Installation
To install the fuel injection pump gear:
1. Verify crankshaft is set to correct BTDC
position for pump timing.
2. Connect timing-light tool J 37077 (refer to
beginning of the section, Setting Static Fuel
Injection Pump Timing). Using hub rotation
tool J 38740, rotate the timing gear hub
clockwise until both lights A and B are lit.
Figure 7-20 — Rotating Timing Gear Hub Clockwise
앫
Use the proper hub rotation tool J 38740
which allows rotation of the hub only.
앫
Do not use the inner shaft nut (25 mm) to
rotate the timing gear hub.
앫
If the inner shaft nut is used to rotate the hub,
the nut may loosen, resulting in subsequent
failure.
200452a
KENT-MOORE
A
B
POWER
POSITION SENSOR
J 37077
J 38740
5-101.bk Page 15 Friday, March 17, 2006 11:05 AM
Содержание E7
Страница 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Страница 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Страница 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Страница 7: ...SAFETY INFORMATION Page iii SAFETY INFORMATION front fr5 Page iii Friday March 17 2006 11 04 AM...
Страница 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Страница 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Страница 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Страница 25: ...200 GENERAL INFORMATION Page 1 1 GENERAL INFORMATION 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 59: ...200 ENGINE DISASSEMBLY Page 4 1 ENGINE DISASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Страница 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Страница 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 186: ...Page 6 28 200 ENGINE ASSEMBLY Figure 6 26 Flywheel Housing Bolts 5 101 bk Page 28 Friday March 17 2006 11 05 AM...
Страница 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Страница 241: ...200 SETUP AND ADJUSTMENTS Page 7 1 SETUP AND ADJUSTMENTS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 263: ...200 ENGINE INSTALLATION TESTING Page 8 1 ENGINE INSTALLATION TESTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Страница 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Страница 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Страница 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Страница 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Страница 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Страница 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Страница 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...