262
Learning Advanced Features
Run Easy Start On to easily setup the basic motor parameters required to operate a motor in a
batch. Set CNF-61 (Easy Start On) to ‘1 (Yes)’ to activate the feature, initialize all parameters by
setting CNF-40 (Parameter Init) to ‘1 (All Grp)’, and restart the inverter to activate Easy Start On.
Group Code Name
LCD Display
Parameter Setting
Setting Range
Unit
CNF
61
Parameter easy start
settings
Easy Start On 1
Yes
-
-
Code
Description
CNF-61
Easy Start
On
Follow the procedures listed below to set the easy start on parameters.
No
Procedures
1
Set CNF-61 (Easy Start On)
to ‘1(Yes)’.
2
Select
‘
1 (All Grp)’ in CNF-40
(Parameter Init) to initialize all parameters
3
Restarting the inverter will activate Easy Start On. Set the values in the following
screens on the Keypad. To escape from Easy Start On, press the [ESC] key.
•
Start Easy Set: Select ‘Yes’.
•
CNF-43: Select a macro.
•
BAS-10 60/50 Hz Sel: Set motor rated frequency.
•
DRV-14 Motor Capacity: Set motor capacity.
•
BAS-13 Rated Curr: Set motor rated current.
•
BAS-15 Rated Volt: Set motor rated voltage.
•
BAS-11 Pole Number: Set motor pole number.
•
BAS-19 AC Input Volt: Set input voltage.
•
PRT-08 Select start at trip reset
•
PRT-09 Retry Number: Sets the number of restart trial when
performing a trip reset.
•
COM-96 PowerOn Resume: Sets the serial communication restart
function.
•
CON-71 SpeedSearch: Set SpeedSearch.
•
DRV-06 Cmd Source: Set command source.
•
DRV-07 Freq Ref Src: Set Frequency Reference source.
•
AP3-01 Now Date : Set the current date.
•
AP3-02 Now Time : Set the current time.
When the settings are complete, the minimum parameter settings on the motor
have been made. The Keypad will return to a monitoring display. Now the motor
Содержание 6731001500
Страница 1: ......
Страница 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500kW 3 Phase ...
Страница 34: ...21 Installing the Inverter 400 V 220 500kW ...
Страница 37: ...Installing the Inverter 24 3 Remove the keypad from the inverter body 0 75 30kWModels 37 90kWModels ...
Страница 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Страница 66: ...Perform BasicOperations 53 ...
Страница 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Страница 107: ...94 Learning BasicFeatures ...
Страница 129: ...116 Learning BasicFeatures second to 0 01 second will resultin amodified acceleration time of 60 00 seconds ...
Страница 151: ...138 Learning BasicFeatures Group Code Name LCDDisplay ParameterSetting SettingRange Unit frequency ...
Страница 187: ...174 Learning Advanced Features PIDCommandBlock ...
Страница 188: ...175 Learning Advanced Features ...
Страница 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Страница 190: ...177 Learning Advanced Features PIDOutputBlock ...
Страница 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Страница 205: ...192 Learning Advanced Features EPID1Controlblock ...
Страница 206: ...193 Learning Advanced Features EPID2Controlblock ...
Страница 228: ...215 Learning Advanced Features ...
Страница 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Страница 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Страница 363: ...350 Learning Protection Features Fan life examination isonlyfor the reference and cannot be used asan absolute value ...
Страница 404: ...391 RS 485 Communication Features B3 4th motor running B2 3rd motor running B1 2nd motor running B0 1st motor running ...
Страница 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Страница 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Страница 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Страница 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Страница 588: ...575 Troubleshooting ...
Страница 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Страница 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Страница 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Страница 643: ...630 ...
Страница 644: ...631 ...
Страница 645: ...632 ...