
245
Learning Advanced Features
Speed search for general
acceleration
Initialization after a fault trip
Restart after instantaneous power
interruption
Starting with power-on
Speed search for general acceleration:
If bit 1 is set to ‘1’ and the inverter
operation command runs, acceleration starts with the speed search
operation. When the motor is rotating under load, a fault trip may occur if
the operation command is run for the inverter to provide voltage output.
The speed search function prevents such fault trips from occurring.
Initialization after a fault trip other than an LV trip:
If bit 2 is set to ‘1’ and
PRT-08 (RST Restart) is set to ‘1 (Yes)’, the speed search operation
automatically accelerates the motor to the operation frequency used before
the fault trip when the [Reset] key is pressed (or the terminal block is
initialized) after a fault trip.
Automatic restart after a power interruption:
If bit 3 is set to ‘1,’ and if a
low voltage trip occurs due to a power interruption but the power is
restored before the internal power shuts down, the speed search operation
accelerates the motor back to its frequency reference before the low
voltage trip.
If an instantaneous power interruption occurs and the input power is
disconnected, the inverter generates a low voltage trip and blocks the
output. When the input power returns, the operation frequency before the
low voltage trip and the voltage is increased by the inverter’s inner PI
control.
If the current increases above the value set at CON-72, the voltage stops
increasing and the frequency decreases (t1 zone). If the current decreases
below the value set at CON-27, the voltage increases again and the
frequency stops decelerating (t2 zone). When the normal frequency and
voltage are resumed, the speed search operation accelerates the motor
back to its frequency reference before the fault trip.
Содержание 6731001500
Страница 1: ......
Страница 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500kW 3 Phase ...
Страница 34: ...21 Installing the Inverter 400 V 220 500kW ...
Страница 37: ...Installing the Inverter 24 3 Remove the keypad from the inverter body 0 75 30kWModels 37 90kWModels ...
Страница 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Страница 66: ...Perform BasicOperations 53 ...
Страница 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Страница 107: ...94 Learning BasicFeatures ...
Страница 129: ...116 Learning BasicFeatures second to 0 01 second will resultin amodified acceleration time of 60 00 seconds ...
Страница 151: ...138 Learning BasicFeatures Group Code Name LCDDisplay ParameterSetting SettingRange Unit frequency ...
Страница 187: ...174 Learning Advanced Features PIDCommandBlock ...
Страница 188: ...175 Learning Advanced Features ...
Страница 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Страница 190: ...177 Learning Advanced Features PIDOutputBlock ...
Страница 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Страница 205: ...192 Learning Advanced Features EPID1Controlblock ...
Страница 206: ...193 Learning Advanced Features EPID2Controlblock ...
Страница 228: ...215 Learning Advanced Features ...
Страница 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Страница 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Страница 363: ...350 Learning Protection Features Fan life examination isonlyfor the reference and cannot be used asan absolute value ...
Страница 404: ...391 RS 485 Communication Features B3 4th motor running B2 3rd motor running B1 2nd motor running B0 1st motor running ...
Страница 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Страница 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Страница 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Страница 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Страница 588: ...575 Troubleshooting ...
Страница 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Страница 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Страница 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Страница 643: ...630 ...
Страница 644: ...631 ...
Страница 645: ...632 ...