227
Learning Advanced Features
Code
Description
AP3-11–AP3-20 Period 1–4
Start T
The start time for the 4 time periods can be set up to 4.
AP3-12–AP3-21 Period 1–4
Stop T
The end time for the 4 time periods can be set up to 4.
AP3-13–AP3-22
Period 1~4 Day
The Time period date for the operation can be set up to 4. It can be set
on a weekly basis. If the bit is ‘1 (on)’, it indicates the relevant day is
selected. If the Bit is ‘0 (off)’, it indicates the relevant day is not selected.
Bit
6
5
4
3
2
1
0
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
AP3-30–AP3-51
Exception1–8 Start T
The operation start time for the 8 Exception days can be set.
AP3-31–AP3-52
Exception1–8 Stop T
The operation end time for the 8 Exception days can be set.
AP3-32–AP3-53
Exception1–8 Date
The date for the 8 Exception days can be set.
AP3-70 Time Event En
Enables or disables the Time Event
Setting
Function
0
No
Time Event is not used.
1
Yes
Time Event is used.
AP3-71 T-Event Status
It shows which T-Event from 1–8 is being performed.
7
6
5
4
3
2
1
0
T-
Event
8
T-
Event
7
T-
Event
6
T-
Event
5
T-
Event
4
T-
Event
3
T-
Event
2
T-
Event
1
AP3-72–86 T-Event1–8
Period
Select the desired module of the Time Module and Exception Day set in
AP3-11–AP3-53 for the relevant events.
If the bit is 1, it indicates the relevant Time Module or Exception Day is
selected. If the Bit is 0, it indicates the Time Module or Exception Day is
not selected.
bit
11
10
9
8
7
6
5
4
3
2
1
0
Ex
ce
p
tio
n
D
ate
8
Ex
ce
p
tio
n
D
ate
7
Ex
ce
p
tio
n
D
ate
6
Ex
ce
p
tio
n
D
ate
5
Ex
ce
p
tio
n
D
ate
4
Ex
ce
p
tio
n
D
ate
3
Ex
ce
p
tio
n
D
ate
2
Ex
ce
p
tio
n
D
ate
1
Pe
rio
d 4
Pe
rio
d 3
Pe
rio
d 2
Pe
rio
d 1
Содержание 6731001500
Страница 1: ......
Страница 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500kW 3 Phase ...
Страница 34: ...21 Installing the Inverter 400 V 220 500kW ...
Страница 37: ...Installing the Inverter 24 3 Remove the keypad from the inverter body 0 75 30kWModels 37 90kWModels ...
Страница 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Страница 66: ...Perform BasicOperations 53 ...
Страница 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Страница 107: ...94 Learning BasicFeatures ...
Страница 129: ...116 Learning BasicFeatures second to 0 01 second will resultin amodified acceleration time of 60 00 seconds ...
Страница 151: ...138 Learning BasicFeatures Group Code Name LCDDisplay ParameterSetting SettingRange Unit frequency ...
Страница 187: ...174 Learning Advanced Features PIDCommandBlock ...
Страница 188: ...175 Learning Advanced Features ...
Страница 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Страница 190: ...177 Learning Advanced Features PIDOutputBlock ...
Страница 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Страница 205: ...192 Learning Advanced Features EPID1Controlblock ...
Страница 206: ...193 Learning Advanced Features EPID2Controlblock ...
Страница 228: ...215 Learning Advanced Features ...
Страница 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Страница 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Страница 363: ...350 Learning Protection Features Fan life examination isonlyfor the reference and cannot be used asan absolute value ...
Страница 404: ...391 RS 485 Communication Features B3 4th motor running B2 3rd motor running B1 2nd motor running B0 1st motor running ...
Страница 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Страница 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Страница 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Страница 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Страница 588: ...575 Troubleshooting ...
Страница 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Страница 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Страница 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Страница 643: ...630 ...
Страница 644: ...631 ...
Страница 645: ...632 ...