Event Scheduling
DS2 Docking Station
220
INDUSTRIAL SCIENTIFIC
Version 9.1 (P/N: 17112798)
Step Instruction
7.
From the General tab, select an Interval. The choices are:
Upon Docking - If you select “Upon Docking,” you must also specify an
Effective Date when the event should start running. The event runs each time
that an instrument is docked in the IDS.
Daily - If you select “Daily,” you must also specify an Effective Date to
indicate when the event should start running and a Run Time to indicate the
time at which the event should run. Daily calibration and bump test events may
be set to run up to 4-times per day at intervals of 6 hours, 8 hours, 12 hours and
24 hours.
Weekly - If you select “Weekly,” you must also select a Day (e.g., Sunday,
Monday, etc.) to indicate the day of the week on which the event should run,
and specify an Effective Date to indicate when the event should start running
and a Run Time to indicate the time at which the event should run.
Monthly - If you select “Monthly,” you must also select a Day (e.g., 1st, 2nd,
3rd . 31st) to indicate the day of the month on which the event should run, and
specify an Effective Date to indicate when the event should start running and a
Run Time to indicate the time at which the event should run.
NOTE:
If you select the 30th or 31st as the
Day
, the event runs on the last day of the month for
months that do not have 30 or 31 days, e.g., the event would run on February 28th.
Step Instruction
8.
If you do not want the event to run, click in the checkbox next to the Disabled option.
If the Event is already disabled, you can also enable the event by deselecting the
checkbox next to the Disabled option.
9.
Click OK to save the changes to the Event.
Table 9-1. Default Settings for Global Instrument Events
Event Default
Settings
Bump Test
Interval:
Daily, 24 hours
Effective Date:
1/1/03
Run Time:
12:00 AM
Bump Test (Tango) Interval:
Daily, 24 hours
Effective Date:
4/10/33
Run Time:
12:00 AM
Diagnostics
Interval:
Daily, 24 hours
Effective Date:
1/1/03