
2.
Double-click the source NE (NE1) on the right of the main topology. The
Select Board
Port-Source
dialog box is displayed. Select the required SP3D board and
Tributary
Port
. Click
OK
.
3.
Double-click the sink NE (NE2) on the right of the main topology. Configure NE2 in the
same manner.
4.
Select
Copy after Creation
and click
Apply
. In the
Operation Result
dialog box
indicating that the operation succeeded, click
Close
. Then, the
Copy
dialog box is
displayed.
5.
In
Available Timeslots/Port
, select the ports from NE2-Slot3-SP3D-2(SDH_TU-2) to
NE1-Slot3-SP3D-5(SDH_TU-5), and click
Add
.
6.
In the
Operation Result
dialog box indicating that the operation succeeded, click
Close
.
7.
Optional:
In the
Operation Result
dialog box indicating that the operation succeeded,
click
Browse Trail
to query the created VC12 services.
Step 4
Optional:
Modify the parameters
SD Condition
,
Revertive Mode
, and
Switching Mode
for
the linear MSP.
NOTE
l
The parameter settings of the sink NE must be the same as those of the source NE.
l
When modifying
Switching Mode
,
l
Ensure that the protection group is in a proper state.
l
Ensure that the protection protocol is disabled.
1.
Choose
Service
>
SDH Protection Subnet
>
Maintenance SDH Protection Subnet
from
the Main Menu to display the
SDH Protection Subnet Common Attributes
window.
2.
Select the created linear MSP group. In the
Protection Subnet Maintenance
tab, select
all nodes, right-click and choose
Start/Stop Protocol
>
Stop
from the shortcut menu.
3.
Click the
Protection Subnet Parameters
tab and modify the parameters
SD Condition
,
Revertive Mode
, and
Switching Mode
.
4.
Click
Apply
. Then, click
Close
in the
Operation Result
dialog box indicating that the
operation succeeded.
5.
After the parameters are modified, restart the protection protocol according to
.
Step 5
Check whether the service configuration is correct. For details, see Verifying the Correctness
of the SDH Service Configuration.
Step 6
Enable the performance monitoring function of the NEs. For details, see Setting Performance
Monitoring Parameters of an NE.
Step 7
Back up the configuration data of the NEs. For details, see Backing Up the NE Database to the
SCB Board.
----End
3 Configuring SDH Services
OptiX OSN 550 Multi-Service CPE Optical Transmission
System
Configuration Guide
3-20
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2011-06-30)