
104
SCS Series Manual —
P/N 15712:L 7/18/16
The SCS⁄SCE
Building-Specific Operation and Programming Examples
Once all mapping information is determined, there are only three more items to keep in mind before entering full point programming:
1.
All monitor modules used for smoke control must have the tracking option enabled. This is set by answering "Y" to the question:
IS@THE@TRACKING@OPTION@TO@BE@ENABLED@FOR@THIS@DEVICE?@(Y=YES,N=NO)@@@@@@@@@@@:
2.
All control modules used for smoke control must have the walk test option disabled. This is set by answering "N" to the question:
IS@THE@WALK@TEST@OPTION@TO@BE@ENABLED@FOR@THIS@DEVICE?@(Y=YES,N=NO)@@@@@@@@@@:
3.
All control modules used for smoke control must have the signal silence option enabled. This is set by answering "Y" to the question:
IS@THE@SIGNAL@SILENCE@OPTION@TO@BE@ENABLED@FOR@THIS@DEVICE?@(Y=YES,N=NO)@@@@@:
With all software type IDs determined, the CBE equations determined, the protocol point mapping determined, and the features listed above
kept in mind, the designer can enter full point programming and program all control and monitor modules for smoke control.
Once all programming on the FACP has been completed, the system can be tested for proper operation. If the testing is successful, the smoke
control system would be fully operational.