31
2
Measurement Preparations
2.1 Preparation Flowchart
Before preparing for measurement, be sure to read “Operating Precautions” (p. 12).
Refer to “Appx. 9 Attaching Rack-mounting Hardware to the Instrument” (p. Appx.12) for rack mount
-
ing.
(1) Installing the Instrument (p. 12)
(2) Connecting the Power Cord (p. 34)
(3)
Connect measurement cables, optional Hioki probes or test fixture to the measurement
connectors (p. 35)
Check that the instrument’s power switch is turned
off.
(4) Connect the external interface (as needed)
For more information about making RS-232C, GP-IB, USB, and LAN connections, see the Com
-
munications Instruction Manual on the bundled LCR Application Disc.
External interface
RS-232C
GP-IB
USB
LAN
(5) Turning Power On (p. 36)
2 Measurement Preparations
2
Measurement Preparations
Содержание IM3536
Страница 20: ...16 Operating Precautions ...
Страница 34: ...30 Screen Layout and Operation ...
Страница 140: ...136 Testing the System Self diagnosis ...
Страница 224: ...220 About Measurement Times and Measurement Speed ...
Страница 240: ...236 Discarding the Instrument ...
Страница 254: ...Appx 14 Dimensional Diagram Appx 10 Dimensional Diagram 230 114 15 48 33 33 25 35 119 1 330 1 Unit mm ...
Страница 264: ...Appx 24 Device Compliance Statement ...
Страница 270: ...Test Equipment Depot 800 517 8431 99 Washington Street Melrose MA 02176 TestEquipmentDepot com ...