Commissioning
Proline Promass 83
56
Hauser
6
Commissioning
6.1
Function check
Make sure that the following function checks have been performed successfully before
switching on the supply voltage for the measuring device:
• Checklist for "Post-installation check"
• Checklist for "Post-connection check"
6.2
Switching on the measuring device
Once the function check has been performed successfully, the device is operational and can
be switched on via the supply voltage. The device then performs internal test functions and
the following messages are shown on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an error message indicating the cause is displayed.
PROMASS 83
START-UP
RUNNING
Startup message
▾
PROMASS 83
DEVICE SOFTWARE
V XX.XX.XX
Current software version
▾
CURRENT OUTPUT
FREQUENCY OUTPUT
RELAY
STATUS INPUT
List of installed input/output modules
▾
SYSTEM OK
→
OPERATION
Beginning of normal measuring mode
▾
Содержание HART Proline Promass 83
Страница 2: ...Proline Promass 83 2 Endress Hauser...
Страница 147: ...Proline Promass 83 Endress Hauser 147...
Страница 148: ...www addresses endress com...