16
Gentier Real-Time PCR System
C. The Preparation before Experiment
1. Instrument Self Inspection
The Gentier instrument possesses self-inspection function, it is recommended to let the
instrument conduct the self-inspection before running any experiment, to ensure that it can
work normally.
1
st
Step
: switch on the power switch of Gentier instrument.
2
nd
Step
: Gentier instrument will automatically conduct the self-inspection after power on,
which will inspect instrument version, whether electric system is in normal working
state, whether power supply is normal and initialize the motor positions, etc.
3
rd
Step
: after the self-inspection, the Gentier instrument will enter the standby state.
Caution
: before power on the Gentier instrument, please ensure:
The transport lock of the Gentier instrument is removed.
The external devices of the Gentier instrument are properly connected.
The power supply of Gentier instrument is properly connected.
Caution:
in case the Gentier instrument fails to pass the self-inspection, do not slap or shake
it, please contact the distributor or
XATL Co., LTD.
2. Reagent Preparation
1
st
Step:
please follow the operation instructions of PCR kit to prepare the PCR reagent.
2
nd
please add the sample and PCR reagent into the suitable consumables, if needed,
Step:
please seal the consumables.
3. Instrument Loading
1
st
Step
:
press
<
Open/Close >
function key on the instrument touch screen, the
instrument will eject the loading platform and the sample block will be present in
front of the user.