
NM2B
REPLACEMENT PROCEDURES (continued)
4.2.14
Tighten the regulator mounting setscrews to a torque of 50 to 55 in.
lbs.
4.2.15
Tighten the compression fittings.
4.2.16
Locate the TEE fitting in the ¼ in. diameter regulator output line,
and remove the plug from the TEE fitting.
4.2.17
Set the regulator output pressure in accordance with the Cylinder
Pressure Regulator Adjustment given in Section 5.
4.2.18
Perform the following leak test on the high pressure side of the
regulator:
4.2.18.1
Open the cylinder valve and check for a pressure
indication on the corresponding gauge at the gas
instrumentation panel.
NOTE:
The cylinder used for this test must
contain the following minimum pressure:
O
2
: 1000 Psi
N
2
O
:
700 Psi
HE
: 1000 Psi
CO
2
:
800 Psi
AIR
: 1000 Psi
N
2
: 1000 Psi
4.2.18.2
Close the cylinder valve and remove the cylinder from the
yoke.
4.2.18.3
For any gas, the pressure should not drop more than 50
Psi in two minutes.
4.2.19
Re-install the cylinder in the yoke.
4.2.20
Replace the table top and its retaining screws.
4.2.21
Replace the top drawer in the cabinet.
4.2.22
Connect the pipeline hoses.
4.2.23
Perform the PMS Procedure given in Section 6.
Rev. A
4-7
Содержание Narkomed 2B
Страница 2: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 18: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 32: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 240: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 244: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 306: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...