
NM2B
PMC PROCEDURE (continued)
6.12.16
Open the corresponding cylinder valve and set the System Power switch
to ON.
6.12.17
Set the corresponding flow to 4 l/min.
( )
6.12.18
On the second test gauge, what is the regulator output pressure? ___
PSI (40 - 49 for N2O), (43 - 49 for Air)
6.12.19
Depressurize the gas circuit.
6.12.20
Remove the test gauge and replace the plug in the TEE fitting.
( )
6.12.21
Repeat Steps 6.12.13 thru 6.12.20 for all other gases except CO
2
circuits.
Rev. Y
6-27
Содержание Narkomed 2B
Страница 2: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 18: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 32: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 240: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 244: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 306: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...