
PMC PROCEDURE (continued)
NM2B
6.11 YOKES & GAUGES
( )
6.11.1
Yokes & Check Valves
6.11.1.1
Turn the System Power switch to STANDBY.
6.11.1.2
Disconnect all pipeline hoses and close all cylinder valves.
6.11.1.3
Remove cylinder or yoke plug from each yoke assembly.
6.11.1.4
Do all the yoke handles adjust smoothly? ___ (Y)
6.11.1.5
Are the two (2) yoke pins installed securely in each yoke? ___ (Y)
6.11.1.6
Is there only one (1) cylinder washer on each yoke assembly? ___
(Y)
6.11.1.7
Is there a yoke plug attached to each yoke assembly? ___ (Y)
6.11.1.8
Is the proper gas I.D. label affixed to each yoke assembly? ___ (Y)
6.11.1.9
Attach a cylinder to each yoke assembly, open the cylinder valve,
let the pressure stabilize, close the cylinder valve, and remove the
cylinder from the yoke assembly.
6.11.1.10 Does the yoke check valve assembly prevent the escape of
excessive pressure? ___ (Y)
6.11.1.11 Attach the cylinders to the yokes.
Rev. Y
6-24
Содержание Narkomed 2B
Страница 2: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 18: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 32: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 240: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 244: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Страница 306: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...