
3.1 Turning On Your Workstation
Figure 3–1 Turning on the system unit
WS3PO058
On/off switch
in the on position
PMAG-C
2
R
G
B
W 359
Hz 50-60
A 7.9/4.2
V~100-120/22
V~220-240 A 1.7
V~100-120 A 3.0
When you turn on the system unit, the following things happen:
• The green power indicator light glows on the front of the system unit.
• The system unit runs the automatic power-up self-test, which takes
from 1 to 5 minutes. The system displays the names of each subtest
that it runs at the bottom of the screen. Some tests display asterisks
(*) and other symbols, and some tests cause the screen to flicker.
If you have multiple monitors, the monitor connected to the graphics
module in the lowest-numbered option slot displays all system test
information. At the end of the power-up self-test, messages explaining
any errors that occurred during any of the subtests scroll across the
screen. (You can redisplay these messages later.)
For more information on the power-up self-test, see Section 3.3.
Starting and Testing 3–3
Содержание 5000/260
Страница 1: ...Order Number EK 4MMAX OP A01 DECstation 5000 Model 260 Operator s Guide...
Страница 14: ...Part I Introducing Your Workstation...
Страница 64: ...Part II External Additions to Your Workstation...
Страница 113: ...Part III Internal Parts and Additions to Your Workstation...
Страница 122: ...8 4 Using the Antistatic Wrist Strap Figure 8 3 Using an antistatic wrist strap MLO 010285 Inside the System Unit 8 9...
Страница 147: ...Part IV Managing Your Workstation...
Страница 192: ...Part V Appendixes...