5/132
RE 30201-B/07.2014, SYEPS series 1X,
Bosch Rexroth AG
10.2.1 Inspection for leakage
111
10.2.2 Check for generation of noise
111
10.2.3 Check of mounting elements
111
10.2.4 Check of operating temperature
111
10.2.5 Check of gas charge pressure
111
10.2.6 Oil analysis
112
10.2.7 Open-loop-controlled operation of the punching axis with test box VT-VET in
conjunction with variant “High“
113
10.3 Repair
113
10.4
Spare parts
114
11
Demounting and replacement
116
11.1
Required tools
116
11.2
Preparing demounting
116
11.3 Demounting
116
11.4
Preparing the components for storage or further use
116
11.5
Replacing components
116
11.5.1 Pilot valve STW243 (High), STW365 (Advanced); H-4WEH (Standard)
117
11.5.2 High-response valve High STW243/STW282
117
11.5.3 High-response valve Advanced STW365
118
11.5.4 High-response valve H-4WEH 10
118
11.5.5 LP accumulator
119
11.5.6 HP accumulator
119
11.5.7 Position measuring system
119
12 Disposal
121
12.1
Environmental protection
121
13
Extension and conversion
121
14 Troubleshooting
122
14.1
How to proceed for troubleshooting
122
14.2
Oil cleanliness
122
14.3
Fault table
123
15
Technical data
126
16 Annex
127
16.1
Address directory
127
17
Alphabetical index
128