4/132
Bosch Rexroth AG
, SYEPS series 1X, RE 30201-B/07.2014
7.5.1 Mounting the SYEHL punching axis mechanically
38
7.5.2 Mounting the SYEHL punching axis hydraulically
38
7.5.3 Installing the HNC100
43
7.5.4 Connecting the SYEHL and HNC100 electrically
43
7.5.5 Wiring of high-response valve
50
8 Commissioning
57
8.1
Initial commissioning
57
8.1.1 General operating conditions – control side, system
57
8.1.2 Commissioning the HNC100 and electronics
58
8.1.3 Inspecting piping and wiring
65
8.1.4 Charging the accumulator
65
8.1.5 Mounting the flushing valve
68
8.1.6 Connecting the pressure gauge
68
8.1.7 Commissioning the power unit
69
8.1.8 Setting high pressure (HP) and low pressure (LP)
69
8.1.9 Referencing the axis
70
8.1.10 Checking the actual position values and max. stroke
70
8.1.11 Checking the position control
71
8.1.12 Flushing the hydraulic system
71
8.1.13 Removing the flushing valve and mounting the original pilot valve
72
8.1.14 Adjusting the zero point of the high-response valve
73
8.1.15 Testing the machine functions
74
9 Operation
81
9.1
Switch-on sequence
81
9.1.1 Boot mode
83
9.2
Operating modes
84
9.2.1 Punching operating modes
84
9.2.2 Forming operating modes
84
9.2.3 Operating mode in the event of a fault
84
9.2.4 Changing the operating mode
84
9.2.5 Coordinate system of the SYEPS punching system
85
9.2.6 Reference position
85
9.2.7 Punching operating modes
85
9.2.8 Forming operating modes
89
9.2.9 Failsafe operation
92
9.2.10 Energy-saving mode
93
9.3 Configuration
94
9.3.1 Machine data
94
9.3.2 R parameters
97
9.3.3 Process variables
101
9.3.4 Measurement
103
9.3.5 Data transmission
105
9.4
HNC100 error messages - error handling
108
10
Maintenance and repair
110
10.1
Cleaning and care
110
10.2
Maintenance and inspection schedule
110