DS300f G2 Series User Manual
74
c
hanGInG
a
b
ackGrounD
a
ctIvIty
S
cheDule
To change an existing scheduled background activity:
1. Click the
Administration
tab.
2. Click the
Background Activities
icon.
The list of background appears.
3. Click the
Scheduler
button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the
Settings
button.
5. Make settings changes as required:
• Choose a
Start Time
from the drop-down menus.
The menus have a 24-hour clock.
• Choose a
Recurrence Pattern
option, daily, weekly, or monthly.
For the Daily option, enter an interval in the Every field.
For the Weekly option, enter an interval in the Every field and choose one or more days of the week.
For the Monthly option, choose the Day of the Month option or the day of the week option, and choose the day
from the drop-down menu.
• Choose a
Start From
date from the drop-down menus.
• Choose an
End On
option,
No end date or perpetual.
End after a specific number of activity actions.
Until date from the drop-down menus.
• For
Redundancy Check
, choose,
Auto Fix
option – Attempts to repair the problem when it finds an error. Check to enable
Pause on Error
option – The process stops when it finds a non-repairable error. Check to enable
Select LD
– Check the boxes for the logical drives to run Redundancy Check. Check at least one logical drive
6. Click the
Save
button.
e
nablInG
or
D
ISablInG
a
S
cheDuleD
b
ackGrounD
a
ctIvIty
Background activity schedules are enabled by default when you create the schedule. If you want to stop a
background activity now but plan to use it again in the future, disable the scheduled activity rather than deleting
it.
To enable or disable change an existing scheduled background activity:
1. Click the
Administration
tab.
2. Click the
Background Activities
icon.
The list of background appears.
3. Click the
Scheduler
button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the
Settings
button.
5. Uncheck the
Enable This Schedule
box to disable this schedule.
Check the box to enable this schedule.
6. Click the
Save
button.
D
eletInG
a
S
cheDuleD
b
ackGrounD
a
ctIvIty
To change an existing scheduled background activity:
1. Click the
Administration
tab.
2. Click the
Background Activities
icon.
The list of background appears.
3. Click the
Scheduler
button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the
Delete
button.
5.
In the confirmation box, click the confirm button.
Содержание DS300 G2 Series
Страница 1: ...ASUS Storage DS300 G2 Series ...
Страница 11: ......
Страница 34: ......
Страница 38: ......
Страница 262: ......