Inaccuracy
- Starting
- Operating time
±0.5 % of the set pick-up value
±5 % or ± 500 ms
9.2.1.16 Overpower (P>; 32O), underpower (P<; 32U) and reverse power (Pr; 32R)
protection
Table. 9.2.1.16 - 297. Technical data for the power protection functions.
Measurement inputs
Current inputs
Phase current inputs: I
L1
(A), I
L2
(B), I
L3
(C)
Voltage inputs
U
L1
, U
L2
, U
L3
U
L12
, U
L23
, U
L31
(+ U
0
)
Calculated measurement
Three-phase active power
Pick-up
P>
Prev>
0.10…150 000.00 kW, setting step 0.01 kW
-15 000.00…-1.00 kW, setting step 0.01 kW
P<
Low-power blocking P
SET
<
0.00…150 000.00 kW, setting step 0.01 kW
0.00…100 000.00 kW, setting step 0.01 kW
Inaccuracy:
- Active power
Typically <1.0 %P
SET
Operation time
Definite time function operating time setting
0.00…1800.00 s, setting step 0.005 s
Inaccuracy:
- Definite time (P
M
/P
SET
ratio 1.05
→
)
±1.0 % or ±35 ms
Instant operation time
Start time and instant operation time (trip):
- P
M
/P
SET
ratio 1.05
→
<50 ms
Reset
Reset ratio
97 or 103 %P
SET
Reset time setting
Inaccuracy: Reset time
0.000…150.000 s, step 0.005 s
±1.0 % or ±35 ms
Instant reset time and start-up reset
<50 ms
No
Notte!
e!
• Voltage measurement starts from 0.5 V and current measurement from 50 mA. In case either
or both are missing the power measurement is forced to 0 kW. If the settings allow it (low-
power blocking = 0 kW), the P< might be in the trip state during this condition. The trip is
released when the function begins to measure the voltage and the current again.
• When the low-power blocking is set to zero, it is not in use. Also, all power measurements
below 1.00 kW are forced to zero ("P< blocked").
9.2.1.17 Resistance temperature detectors
Table. 9.2.1.17 - 298. Technical data of the resistance temperature detectors.
Inputs
Resistance input magnitudes
Measured temperatures measured by RTD sensors
Alarm channels
12 individual alarm channels
A
AQ
Q-F205
-F205
Instruction manual
Version: 2.04
408
© Arcteq Relays Ltd
IM00013
Содержание AQ F205
Страница 1: ...AQ F205 Feeder protection IED Instruction manual ...
Страница 2: ......
Страница 379: ...Figure 7 4 245 Example block scheme A AQ Q F205 F205 Instruction manual Version 2 04 Arcteq Relays Ltd IM00013 377 ...
Страница 389: ...Figure 8 7 254 Device installation A AQ Q F205 F205 Instruction manual Version 2 04 Arcteq Relays Ltd IM00013 387 ...