7-4 | Thermox Series 2000 WDG Insitu Analyzer
Cell Replacement
Disconnect power from the sensor and control unit and allow the sen-
sor to cool before replacing parts inside the sensor.
Removing the Cell
1. Remove the inner probe assembly.
2. Mark the position of the U-bolt in relation to the heater by drawing a
line on either side of the U-bolt on the top of the heater. This will help
you to determine how far the heater should be placed into the inner
probe assembly during reassembly.
3. Place a mark on the left hex nut of the cell assembly and one on the
inner probe assembly at the end with the wrench flats. This is so that
you can match the orientation of the white cell lead wire.
For example, if the white cell lead wire is positioned at 3 o’clock, place
a mark at 3 o’clock on the left hex nut of the cell assembly and inner
probe assembly. See Figure 7-1 for the location of the left hex nut.
4. Using a 3/8” nut driver, loosen the U-bolts around the heater but don’t
remove them. Remove the 10-32 screw and lock washer on the sheet
metal plate using a flat blade screwdriver (Figure 7-2).
You may find it easier to involve two people to complete the next steps
if the probe is longer than 18 inches.
Cell End
Metal O-Ring
Left Hex Nut
Right Hex Nut
Cell Housing
Cell Assembly
Wrench Flats
on Inner Tube
Wire End
Figure 7-2. Cell assembly.
5. Position a 1” open-end wrench on the wrench flats of the inner probe
assembly (Figure 7-2). Place another 1” open-end wrench on the left
hex nut of the cell assembly and break the seal by unscrewing the left
hex nut.
NOTE
Содержание Thermox WDG Insitu
Страница 12: ...xii Thermox Series 2000 WDG Insitu This page intentionally left blank...
Страница 20: ...1 8 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 24: ...2 4 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 28: ...3 4 Thermox Series 2000 WDG Insitu Analyzer Figure 3 2 Insitu senor mounting...
Страница 44: ...3 20 Thermox Series 2000 WDG Insitu Analyzer Figure 3 19 Sensor connections...
Страница 51: ...Installation and Start Up 3 27 Figure 3 23 Series 2000 2 Wire RS 485 communications connections...
Страница 53: ...Installation and Start Up 3 29 Figure 3 24 Series 2000 4 wire RS 485 communication connections...
Страница 114: ...6 16 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 128: ...7 14 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 154: ...A 26 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 158: ...B 4 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 164: ...D 2 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...